Phase 1: Preparation Phase
1. Raw Material Preparation: The main raw materials include polyurethane resin, solvents (such as toluene, methyl ethyl ketone, etc.), color powder, additives (such as leveling agents, defoamers, etc.), and base fabric. There are various choices for the base fabric, such as knitted fabric, woven fabric, or non-woven fabric. Different base fabrics will impart different physical properties to the synthetic leather, and the selection must be based on product requirements. 2. Equipment Debugging: The equipment of the dry-process production line is debugged, including the batching tank, mixer, release paper unwinder, coating machine, drying oven, laminating machine, release paper rewinder, etc., to ensure normal equipment operation and precise control of all parameters.